Construction of the raised track in South park started at the end of July 2009.

The bad weather of winter finally receded and work on the track accelerated. By Easter most of the pillars and steel sections were in place.

These pictures, taken on 5/4/2010, take a trip round the track starting at the Station.

Station

Just after leaving the station we reach the location for the traverser which will access the steaming bay area. The concrete found in the area has proved to be a major problem. It is not good enough to be used as a base for the traverser and to high to cover over.

stn exit

This a picture showing one of the options for the transporter in the steaming bay. The idea is run from the traverser onto a transporter which can be moved to the left to line up with one of several steaming bay tracks.

steaming bay

Back to the main line and this is the end of the of the North bend.

N bend traverser

Heading south towards the pinch point. On the right is one of the mounds of material removed during the excavations and which will need to be landscaped.

N bend traverser

Another view of the north mound. A lot of this material will be moved to be used elsewhere so eventually it should almost disappear

(note that a right click on the pictures should - browser permitting - allow access to a larger version)

N bend traverser

Heading South to the pinch point

SP track route

On into the South loop

SP track route

 

SP track route

Approaaching the South bend

SP track route

Start of the south bend (the plan is to regrade and seed the inner embankment)

SP track route

The straight in the southern bend

SP track route

Leaving the South bend and into the SW cutting

SP track route

This is mound in the South loop after regrading in preparation for seeding

SP track route

This is section after the pinch point where the pillars have not be posistioned

SP track route

Approaching the station

SP track route

And back to the start